  • Statoil's Well Informed Magazine: Reduced Intervention Start-up Time

    Oseberg Sør has reduced the time for intervention for startup of new wells by 2 days using new pre-installed tubing shear open unloading (UNL) and gas lift valves (GLV).
  • PTC Side Pocket Mandrel

    The NexLift SPM from Petroleum Technology Company enhances the robustness of the completion string. Read more about the NexLift in the JPT Magazine 2015-07.
  • PTC Retro-Fit Lift

    When a well operated by Premier oil in the UK North Sea unexpectedly ceased production, the company undertook a subsea well intervention campaign. Production had ceased following suspected failure of the artificial lift system. Premier approached PTC who came up with a solution involving deployment of an Interwell straddle with the PTC GoLift Straddle Sub and SafeLift IPO and orifice valve that could be installed from a light well intervention vessel. Read more here Offshore Industry, Vol.8 No.2
  • Replaced WRSCSSV with a WIV, Snorre A, Well P-12

    The well P-12 on Snorre A is a water injector completed in January 1994. In 2008 the TRSCSSV was locked open and replaced by an insert safety valve, WRSCSSV.
  • Interview: Alan Brodie – Middle East Region Manager, PTC, Abu Dhabi

    Middle East Region Manager Alan Brodie discusses PTC’s operations in the region, their unique portfolio of world-leading proprietary, innovative well technologies and services, his optimism for PTC’s future growth in the region and his perspective on Abu Dhabi’s petroleum industry.